|

|
Video One
RAM ECO AWP can be blended in any hot plant providing increased safety.
Note, no smoke from the bag house.
(Running Time 40 seconds)
Windows / Quicktime / Mobile
|

|
Video Two
Double (Cape) Chip Seals with TR (½-3/4 inch base
and 1/8 inch cape
(Running Time 60 seconds)
Windows / Quicktime / Mobile
|

|
Video Three
CQS Slurry Seal made with RAM Technology. Easily worked and applied.
(Running Time 27 seconds)
Windows / Quicktime / Mobile
|
 |
Video Four
Placement of Rubber Modified Asphalt Cement (RMAC) 3" Dense Grade Overlay
(Running Time 3 min 02 seconds)
Windows / Quicktime / Mobile
|
|
|

|
|

|